page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27 page 28
page 29
page 30
page 31
< prev - next > Energy Solar energy off grid solar install manual (Printable PDF)
Small Scale Offgrid Solar PV: Installation Manual
Measure and strip the insulation required for the cable to enter up to the midpoint of the terminal.
Twist the strands together. Repeat with the second cable.
When positioning the terminal ensure that no strands are outside the interior metal tube. The end of
the cable should be halfway down, but stripped cable should not be visible on where it goes into the
terminal.
Push the other cable into the other side of the terminal in the same way. Position the terminal in
the jaws of the crimping tool. It should be positioned so that the metal tube is crimped (not just the
exterior insulation) but without squashing the part of the terminal for the other cable.
Fully close the crimping tool. On opening it the terminal and the cable are squashed together. Make
sure it’s strong by pulling it.
Crimp the second cable in the other half. Protect the joint with insulating tape.
27